RWHS MEP Upgrades

Project Description

Client: Regional West Medical Center
Location: Scottsbluff, NE
Schedule: February 2019 – December 2019 (expected)
General Contractor: Beckenhauer Constriction, Inc.
Subcontract Sum: $4.9 Million

Project Summary:  Mechanical Electrical and Plumbing upgrades for the Chillers, Generators, AHU-35 & DA Tank. This project was a massive upgrade Mechanical System at RWMC. Every activity had to be carefully planned on this project to ensure proper fitment of all elements for all trades. Once again, we utilized our laser scanner and created our own 3D model at multiple points throughout the duration of this project; once before demolition had started, once when everything was demolished and again after everything was set in place to ensure quality. During the coordination process we noticed the existing environment did not match the construction documents. This information was conveyed to the rest of the design team and was able to be observed & evaluated for an appropriate decision on moving forward.  During this project, we had to set up some temporary equipment to eliminate unnecessary down time for the Hospital.

RWMC ICU & Central Sterile Addition & Renovation

Project Description

Client: Regional West Medical Center
Location:  Scottsbluff, NE
Schedule: February 2019 – December 2019 (expected)
General Contractor: Beckenhauer Construction, Inc.
Subcontract Sum: $3.6 Million

Project Summary:  Remodel and upgrade of existing 2nd floor Intensive Care Unit adding nearly 2,800 SF to the 2nd level. This project will provide RWMC with 12 new patient rooms in the ICU with viewing stations for every room.  We also replaced old dirty duct and equipment on the 1st floor above the kitchen area including new sterilizers for the cafeteria dishware and silverware. We utilized our laser scanning process on this project to capture existing conditions and reconnect all the existing plumbing stubbed down from 3rd floor. We laid out the proper locations for the piping to be hidden in the wall cavities before the walls were framed with our robotic total station. With only 10’ of space to work with from top of floor to bottom of deck, it left us with a very small ceiling space. We collaborated with our in-house design team to coordinate all the above-ceiling components to their designated places with 3d modeling and spatial coordination efforts.

GPH – Emergency Department Additions & Renovation

Project Description

Client: Great Plains Health
Location: North Platte, NE
Project Size: 15,000 SF
Schedule: May 2018 – October 2020 (expected)
General Contractor:  Sampson Construction
Subcontract Sum: $3.8 Million

Project Summary:  New Emergency room entrance with transparent glass awning above and a 6 circuit underground electrical snowmelt system under concrete entryway. New floor space in in area A and B penthouse mechanical room in area B. New examination rooms, Physician offices, a locker room with showers for ER staff and rest areas for staff. 6 fast-track areas for noncritical treatment. One Trane 11,000 CFM AHU in Area B Mechanical Penthouse. PRICE terminal units installed throughout remodel and newly constructed areas. Mitsubishi Ductless Split System serving Penthouse Electrical room. New extra security – card reader entry linked network system, interior/exterior video surveillance security cameras & Bulletproof/ Transparent changing to privacy glass windows.

Dundy County Hospital PT addition and Renovation

Project Description

Client: Dundy County Hospital
Location:
Project Size:
Schedule: March 2019 – March 2020
General Contractor: BD Construction
Subcontract Sum: $885,012

Project Summary: 5,000 SF of new hospital space featuring a new therapy pool with an underwater treadmill and massaging jets, a gym, 3 showers, a men and women’s locker room, 4 treatment rooms, 8 offices, 2 exam rooms, 6 restrooms a reception area and a waiting area.

Project Description

Client:
Location:
Project Size:
Schedule:
General Contractor:
Subcontract Sum:

Project Summary:

Great Plains Health Patient Tower

Project Description

Client:   Great Plains Health
Location:   North Platte, NE
Surface Area: 220,000 SF
Schedule: April 2013 – June 2015
Subcontract Sum: $38.5 M

Project Summary:

5 story patient tower with mechanical penthouse on 6th floor & Central Utility Plant. Existing hospital data system relocated and upgraded. GPH is the first hospital in the state of Nebraska to implement the GetWell Network, which is an interactive communication system designed to engage the patients to be proactive about their healthcare and have an open line of communication to their providers. This was the first project Snell used BIM (Building Information Modeling) tools and techniques to help stay ahead of schedule. Over 300 plumbing and electrical penetrations per floor were laid out with a Trimble Robotic Total Station 773. This project was also the first time utilizing a pre-fabrication workflow. A lot of the larger 6”-24” hydronic piping system was built in a fabrication shop off-site and brought on-site and installed. The new process was a great success for the construction team, hospital owners and the surrounding community. Snell Services, Inc. was a Prime Contractor on this project. Installing 4 – Caterpillar back-up power supply diesel-powered generators, 5 – Aldrich three-pass firetube boilers,5 Trane Indoor Air Handling Units. 4 of which push 32,000 CFM & 1 is 60,000 CFM, 2 – 750 ton Trane centrifugal water chillers, 2 – Marley Quadraflow Series Crossflow +2,000 GPM Cooling Towers along with various other equipment to keep this health care facility operating safely, comfortable and efficiently.

Gothenburg Memorial Hospital BP#3

Project Description

Client: Gothenburg Memorial Hospital
Location: Gothenburg, NE
Project Size: 64,000 SF
Schedule: November 2015 – March 2017
General: Sampson Construction
Subcontract Sum: $4.5 Million for Mechanical and Plumbing Services

Project Summary: Bid Package #3 – patient wing and emergency department finishes, additions for new main entry and admissions, renovation of imaging, materials management, laundry & Housekeeping, and facilities management, addition of new wellness, physical therapy/ cardiac rehab, dietary, lab clinic and 2nd floor wellness and administration shell space.

Box Butte Hospital

Project Description

Client:   Box Butte Hospital
Location:   Box Butte, NE